August 24th I turned the wires in the ground into a giant extension cord to the shed.  I wire nutted a plug to the basement end and a GFI outlet to the shed end.

 It is temporary until I can get an electrician to wire it up properly.

 I did learn that it is easier to remove the insulation if it has been warmed up. 

August 25th
I delivered my boy on the fence, as highlighted in the last post.  Then I stopped at MCRR.  Learned a lot from Bill about track maintenance.  
 He has all his track leveling tools on one car.  Air compressor to run a air hammer, shovels, tampers, rail bender, levels, brooms, etc...
 He has an electric ballast broom and a ballast car to complete the suite.
 The track leveler is impressive.
 At least until he used the kink remover.
 Ok so the track level has flat wheels, no taper, pivots at one end has two levels and has brakes that hold the position.  Run it about a foot in front of the tamper to help with leveling.  There is a rail prybar that I need to make also, it grabs the railhead and allows lifting to the left or right or straight up if desired.  That prybar will be the first tool I replicate.
The kink remover will be desired as soon as a tree falls on my track.  It grabs the rail and pulls out where tree limbs etc have caused a severe downward divot. 

I thanked Bill profusely for letting me learn from a master.  He has had is railroad 35 plus years.

Aug 28th I bought a set of rollers and sold them on facebook, profit of $17 dollars.

Wednesday I bought metal for a crossing into the back yard.
I knocked on all the neighbors doors and 9 of us lifted the 500lb chunk of steel out of the truck and set it in place.  It was still heavy and one of the neighbor teens did not get his hand out and was pinned to the ground.  I lifted enough so he could get it out I will say I felt soar for a few days, he said he was fine.

With a neighbors help we loaded up the trains in the truck after dark.

Thursday Ops started! Ten days of trains.
I brought my trains to MCRR and ran around the railroad once, they were not ready for ops yet so I asked Bob to put me on a freight crew tomorrow and I went home to make better use of my time.
 I borrowed Bills rail bender and made a whole loop of rail in my backyard.  The handle was well worn and almost broken, so I made a new one.  Thicker steel so it should last a while.
I figured it would be easier to make a new one while the 4 holes were hold not notches.

 Friday to Sunday I played trains at MCRR.  Most of the time I ran with others equipment.  Sunday evening, into the dark I ran my own switch by myself, the only other team out on the railroad was Adam and Olin.  They spent most of the time exchanging a propane tank and reheating the water in the steamer.
Friday night I got home about 8pm.  I was itching for my own railroad to be finished.  300 ties were needed.  So with Nancy and Jon's help I cut enough stock to length, getting done at 9:15 with cutting and 10 with stacking.  Saturday I continued by making ties, Lilli and Jon helped me by sending the half cut two by sixes back to the saw.  
Jon then helped me load the wagon.
Sunday night I packed the trains back on the truck after about 9:30 pm and took them home.  Monday morning I packed for white creek.  Monday I unloaded the truck and started doing switching with Robb.  The next day I switched with Robb, the next Jerry, the next Jerry, then Robb, and Robb on the last day.  I ran the locomotive on that last day, I was tired, and really had enough of running trains.  It was all fun and Robb's GP35 is awesome, it works quite well.

The start of the week at WC it was very hot, then it was rain.  The first rain day I slept in the cab of the truck, (I removed the back seat, Nancy made bug and rain screens for the two big windows)  The bug screens worked well but lots of water came in.  The second night it rained I went an slept at the parents house.  Same with the next night as they were home and I figured it would be good to see them.

Then it got cold, at least it was dry.  I slept two more nights in the truck.  Thursday Robb went to a robotics meeting and he let me drive his GP around.  I picked up 5 coal cars from the yard and ran most of the railroad after dark.  I did make a whole string of empties (it was 3 and 2) and ran the train from the 8th car back.  You have the trust the turnout position from that far back.  Sitting 4 cars back would have the same effect of seeing only a loco and freight cars.  Seeing Robb's loco, a string of cars and his caboose with flashing red taillight is awesome.  To think 5 years ago all the three of us had was my SBT two flat cars and a wood gondola.

Sleeping in the truck was not bad when it was cold, thought the bed is 5 foot 6 and I am 5-11.  Even though I did take pipsqueek and loco 2 they were not used.  I did sent out the red wagon as a freight car, it quickly came back as it did not play well.  I fixed it by bungeeing it to the pink flat and sending it out again.  From Wednesday to Saturday it only made 3 turns.  That might be average for most of the cars, 3 to for 4 moves for the week.  Pretty amazing.

We did have issues with the Military train on Friday.  We choose not to cooperate with them and ran instead.  We were successful in evading them by running backwards 2 blocks, wyeing our train, and running away.  We also talked about other funny things we could do.  The best we thought of was to switch two towns on the railroad, so everyone's map would be wrong.  Other wise be the military train and give people new paperwork when they passed.

Loaded up and drove home early afternoon on Saturday.  Nancy helped me unload the trains, the kids helped unload the truck.

Sunday the 9th brought a day in the yard.  I started installing ties.  about half done with the mainline.  Only 30 feet to go, completed 30 feet today, slow and steady as to not cause back or hand pain so it was over the course of 7 hours.  About 3 hours of work the rest was resting etc... 
 The downfall is I missed on placing the road crossing by a couple feet.  I have a plan to use boards and roll it into place later.
After I get the track in a circle I will need to level it.  My goal is to have the loop done by the end of October.  I have the option of picking up my coal car kit in late October in PA.