This is a neat looking building of Freesoil Michigan
Putting together in one place all the steps of maintaining track.
Sight down the rail to check for grade issues
This tool pulls up vertical kinks
This tool is for leveling side to side, with the level behind it.
A power brush for leveling the ballast
more pictures of the level
Note the flat wheels not tapered
Have a railcar to hold all the tools.
My version of the level. I skipped the wheels and went with nylon blocks with flanges. Two RV levels. The near end pivots easily, the far end is fixed to the two by 6. It works very well to help me level the track.
After putting the in the crossing plate I was able to complete the loop. But the trouble was I had done it on the uneven ground. Nancy bought three yards of top soil to use as fill / ballast. the reasoning is that I can pull up the track and nothing will remain of the track. The rail I planned to install this year was completed Sept 22. I added a parking track in front of shed for the loco and log cars.
Saturday, September 22, 2018
Subscribe to:
Post Comments (Atom)







No comments:
Post a Comment