Wednesday, December 30, 2020

SBT MU Line

 

The MU line was run over the axle and under the battery bay.  I chose to rerun it. 
The new blue line was shoved in to the same hole as the other three.

I drilled a hole in the end frame, choosing a spot in the middle vs trying to hide it as a rivet.
The real fun was drilling to exit the battery bay.  I first made an aluminum wire protector, that did not last long so a steel version was produced.   

Also fixed today was the head end choice, the minimum speed was raised and better sound files, I have the horn and bell for remote as well as on the drivers knees for onboard driving.  The 8 buttons on the back are to display how well the sound system works.  

Three items remain:

  • Programing the remote
  • Programming the receiver
  • Making and programming the data collection box

No comments: