Monday, October 15, 2018

working railroad

 Pictures out of order again for the past month.  First off is one of the first days of using the railroad as a working railroad since I have very few derailments.  The last task of the day was moving some paving stones and gravel to make a step in the path over the mainline and spur to the carbarn.
 Lillian colored a picture of the SBT
 Loco 2 is back on the rails... Because....
 I had a major derailment.  The rail joints These two photos are several weeks old but exhibit why I did not want to have a golden spike ceremony... I still get some derailments in this spots. I need to bend the rail up at the joints, I will need to make the tools Bill has to level the track.  Using a tamping rod, as well as an air chisel as a tamper to compact the soil I am using.
 Back to the weekends work.  We had some unwork, Maple dug up a witch hazel.  freshly watered.  She did this four times in one spot over the course of the day.
 Nancy waters the plants with water brought by train.
 Filled at the far end of the railroad.
 The lumber used to mark each hazel was brought to the shed by train, then after they were built back out by train.
 Seven total.
 After Maple digging and killing one we have 4 witch hazel an oak and a white pine.
 Another task was logging, the whole logs were brought by mule, (parents) or by train to the sawmill, (shed) to be cut into sections and loaded onto a train car.
 A total distance of 50 feet by rail, but fun all the same.
And Lilly and the parents rest inside.

No comments: