Now that there is 50 feet of mainline I can ride the flat cars down the hill. With the carbarn tracks I now have over 100 feet of track down.
I can install 10 feet of ties per drill battery, with two batteries that puts me at 20 feet a night.
As long as I don't run out of ties... which as of friday night I only had six ties left.
But I made my goal, track to the "quary" where the dirt from the front yard is, which I transferred to buckets and dumped along the track to stabilize it. I still have to tamp it more.
I also need to make more ties, for that I need a saw.
Then to cut the wood we have into tie lengths.
After they are all cut to length time to cut them to width.
First batch was 95 ties. I moved those to the end of the line.
The second batch I did not count. It was three wheelbarrow loads, I estimate at 350 ties total.
And a whole lot of sawdust.
Next I plan to start laying rail to the barn from this switch. That will give me track from the neighbors woodpile to ours.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment