Saturday, August 26, 2017

More ties

 Now that there is 50 feet of mainline I can ride the flat cars down the hill.  With the carbarn tracks I now have over 100 feet of track down.
 I can install 10 feet of ties per drill battery, with two batteries that puts me at 20 feet a night.
 As long as I don't run out of ties...  which as of friday night I only had six ties left.
 But I made my goal, track to the "quary" where the dirt from the front yard is, which I transferred to buckets and dumped along the track to stabilize it.  I still have to tamp it more.
 I also need to make more ties, for that I need a saw.
 Then to cut the wood we have into tie lengths.
 After they are all cut to length time to cut them to width.
 First batch was 95 ties.  I moved those to the end of the line.
 The second batch I did not count.  It was three wheelbarrow loads, I estimate at 350 ties total.
 And a whole lot of sawdust.
Next I plan to start laying rail to the barn from this switch.  That will give me track from the neighbors woodpile to ours.

No comments: