Saturday, June 11, 2022

New work shop

The high today was over 100.  The garage faces due east and gets the morning sun on the uninsulated door until about noon.
I got up and in 2.5 hours got one of the mortise in place.  At that rate, two a day on weekends and one each weeknight.  I will have them all done on Friday.
Depending how much time is spent catering to the needs of others.
So I found a new workshop.
The air conditioning increased my productivity.
The carpet was softer on the knees.

I would work on the hole a little, vacuum up the chips, and then check my work.   
I was able to complete four mortise today.  I set the far side on to check how well they aligned and they were all naturally within an 1/8th of an inch side to side where I wanted them, and up down with spot on for all of them.  

After getting Anna from work I started a fifth one,  that required marking the other leg assembly and hogging out all the holes in the garage first.  I have a little cleanup to do on the fifth joint.  It is a little too tight.  It looks like at this pace I will have a frame together by tomorrow evening.  Cutting 5 days off my morning estimation.  
 

No comments: