Sunday, August 26, 2018

A small project

I wanted a small project to work on while it was too hot outside, or rainy or for productive procrastination.

A friend and model railroader has an On30 railroad in his basement with different businesses named after those that visit, help etc.
I am lucky enough to be one of those people, though I have only known Larry for a few months.
There is a gas station next to the tracks of the Laurium, Mohawk and Brockway Railway in the town of Laurium.
Larry takes daily pictures of the railroad and posts on facebook.  Frequently telling a simple story about the old men.   https://www.facebook.com/groups/744092062268264/?sorting_setting=CHRONOLOGICAL

That got me wondering where are all the young men?  It is the summer of 1935 there should be children around.  As it is a cold summer morning in the UP they may be inside, but all of them?  There has to be at least one exuberant 5 year old boy waving at the passing trains.  Or does he see giants in the clouds?
Inspired by norman rockwells boyhood dreams with the boy and dog looking at a train and Winslow homer children on a fence.  I decided to create my own version.
Everything is made of styrene, I took new styrene warmed it with a candle flame and stretched and twisted into the shape I needed.  I would find the part I wanted, like what looked like and arm or leg in the length of chain, leaving the excess on as a handle glue to the body, then after the glue was dry cut off the excess.  There may be some carving with a very sharp knife or a very hot metal object.  Whatever I thought would work.  
The dogs fur and the boys sweater was made by making a slurry of sytrene shavings and model glue and pushing it onto the frame with my fingers, the combination of fingerprints, uneven dissolving etc made a nice texture.  I will say that it is not perfect, the level of detail is average for 1:48, it is possible with 3d printers to get better precision, a more skilled person would do the work better but I had reached a point where I was not making the figures any better and had to stop.  The work progressed over several evenings of the entire summer maybe 20 hours total from research to making the gift box.
Everything is painted with acrylics.  Washes, and drybrushing over the course of several evenings of a week or two.  The dog is a model of our dog Maple. the boy after my 5 year old Jon.  The fence after the one that I grew up with in my yard.  It was a cousin of my Mom that owned a gas station.
Thank you Larry for the honor of adding my humble work to your beautiful model railroad. 

The pictures of the fence installed on the layout are all taken by Larry.

Wednesday, August 22, 2018

Choices

It has been slow on the railroad after filling in the dirt.  My hand was hurt and I am forcing myself to not overuse it.  


After a week my hand felt better so I tied the newest turnout to the end of the line.

Another week and I added a length of track to each direction.  

I have decided to have the mainline be the route closer to the lot line, then curve around to the deck.  The inboard track will be the siding, with an eventual diamond and track leading to the garage for loading and unloading of trains.  

I am now out of ties, I need to cut down my boards to make more.  

I am trying to decide if I need a heavy duty crossing for a vehicle to pass over.  

Saturday, August 11, 2018

Fill it all in

Today we started the morning gluing up the PVC conduit to the shed, and putting it into the trench, then we backfilled, everyone but Anna.  We put a red tape "electrical below" tape six inches below the surfaces.

Now I need an electrician to help me connect the wires properly. 

Thursday, August 09, 2018

Illegal in California

Tonight I continued trenching for the electrical.  I used a method frowned upon in California. 

I used a pressure washer to blast through the problem areas that the ditch witch had.  For over an hour that was the hardpan around the well head.  I think it was the stuff from the well hardened up, once I was able to get through that it was easy going at the other few area.  I sure got muddy though.

Now the whole route is at least 18 inches deep.

While I "dug" nancy rolled out the wire and cut it into four equal sections.  It is long enough to get from the shed to the shop electrical box.  I will have to find out if I can tie in there or I will have to have a junction and tie in at the main.

I plan to run four #6 aluminum wires.  I would also like to run a 14/2 to have the ability to turn on and off a light or such at the shed.


Carbarn Upgrades

The last few weeks I have been working on the shed / carbarn.  I added two windows to the east side.  I used pallet wood to add two 3/4" layers to the floor, the top layer was all 1x12 pine.  We then raised the grey shelf so the wood scrap trash cans would still fit underneath.  Then I added a single 5/8" floor over the ties, just the first 5 feet by the doors and the remainder of the inside track.  Maybe later I will get more wood to do the rest, or just leave it.

Yesterday I started digging for electric to the barn with a pickax.  It was not that difficult, The first 2 feet took a half hour.


But a doctors visit is $120, rental of a ditch digger is $150.

So Nancy rented the digger tonight.  She got it about six, we ate some chicken nuggets then about 7pm I started.

The first time it balked was a tree root about 1 inch in diameter.



The second time was a baseball sized rock



The third time was a softball sized rock

Then a football sized one


Then a beach ball

I have no idea why there are rocks the size of small cars buried in our yard, but rather than break the machine I stopped with the trench.  About 80 feet to an average depth of 18 inches.  A two foot length is only 12 inches deep, it is near the wellhead, maybe it is waste mud from that drilling that cemented.  Most is 18 to 24 inches.

I found that the machine works better when the arm is down all the way and the two largest rocks at each end was not letting me get deeper.  I might try using the pressure washer to blast down.

I did try using the shop vac to pull the loose dirt out of the trench, that worked well, a good task for children to work on tomorrow.

The last thing I did before putting the tool back on the trailer is use it to start a hole for a bush that needs to move for the siding that will be going up the hill.  I have a plan to use the #8 switch to the east of the shed with a parking track to the west that I can add temporary track to the end up the hill into the garage.