Wednesday, November 28, 2018

Front bumper

Tonight I took off the front end sill of the locomotive and started playing around with how large I wanted the replacement.

I think a 7/8th by 10" by 1-13/16" beam looks about right.  It scales out to 6 inches above the rail and tops out at 2 feet above the rail.  I may add a step at the same 6 inches about 10 scale inches wide. 

By tucking extra steel between the frame I can get the weight of this piece up to 6 lbs.  The cab walls weigh 7 lbs, The roof of the cab 5 lbs.  Lead is 50% more, If I make the beam hollow I can increase the weight to 9 or 10 lbs.  If I use oak and fill with lead the weight would go back down... While I like the wood look I need the weight to balance the cab, and provide better traction. 

So in theory the tractive effort of my loco is 28lbs.  (.85)*Boiler pressure*Bore*Bore*Stroke/Drive Diameter. 0.85*90*1*1*1.5/4=28  The weight on drivers should be four times the TE... 115lbs.  The design loco is 66lbs.  My small boiler I think would be taxed by such a heavy loco, there are inefficiencies that should be accounted for so a final weight of 80lbs will give me a TE of 20lbs.  This is up about 6 lbs from when I bought the loco, and it ran quite well. 

Monday, November 26, 2018

Floor frame

 To make the floor frame I decided to repurpose the front floor holder.  I cut it in half and removed the locations other components occupied with a "hand mill."
 Robb meanwhile is considering trading his clishay for this.
 The frame looks good.
 Even better with the floor. Eventually I will get a new boiler that will extend into the empty space.
A sunrise shot on my way into work. 
The propane burner of my locomotive.

Earlier this week I was reaching into one of these dumpsters and felt a pop in my ribs.  It did not feel bad that night but over the next 24 hours it got worse and worse.  Then I rolled over in bed and felt another pop, it is feeling better.
Someday I want to give this machine the attention it deserves.  Currently it has no batteries or control system.
For now I work on the pipsqueek.  No idea why the guy that named it spelled squeak wrong, but they did.
It really did not take all that long to get the floor, this is parallel with the edge to within 0.001 so I am happy with my abilities. 
It fits quite nicely around the johnson bar.
A photo of my hand mill in action.  I have been cutting with my hack saw or band saw and cleaning up with the file. 
Cardboard and cab showing final length.  
A picture of the naked boiler top.

is this another morning or the same one again....
round and round and round it goes
Show me some stop lights
"why not start over?" he asked.
Ouch.
Looking good.
I wanted to build this thing for 10 years, now I have it.
So I am working on this.
So I won't have it for 10 years not running.
Use those muscles.
Spot the differences...
File a little more
Check the fit
yep looks good.
Maybe next year....
still headed in the right direction
It is worth the pain.
The work.
So I can ride the rails.
Into the sunrise.
Behind my own fire propelled locomotive.

Thursday, November 22, 2018

New Cab Floor

Today after going into work for 2 hours I came home and replaced the cooling fan on my Acer AS1410.  I like that (this) computer for it small size and reasonable computation power.  After a dinner without turkey and a nap I came back down and worked on the steamer.  I planned out the drivers side floor, and then used my drill press, bandsaw and files to cut it out.

Then I copied it over to the firemans side and used the bandsaw, hacksaw and files to cut it out. 

Both are square within 5 thou.  And close enough to eachother in size that I can not feel a bump when matched together.

The picture above shows where the new rear of the cab will be.  The loco will be two scale feet longer, one in the cab and a second for a running board.  I will also be adding a pilot to the front of the loco, again with a running board. 

I am still thinking about the tenders, they current one is 4 feet above the rail, the falk "prototype" cab is about 3 feet above the rails and so is it's riding car.  I really want to have my cars similar.  A couple options, new tender with 3" (24" dia) wheels similar to the riding car in California.  Sink the body of the tender down over the frame.  New wheels on this frame.  I am sure there are other solutions also.  Each has drawbacks, such as smaller wheels will make the axle pump closer to the ground / rails.  I think I will make significant progress on the locomotive then circle back to the tenders.  I would like to go through all the Live Steam magazines and find the ones with 4 wheel car plans in them to get ideas.

Sunday, November 18, 2018

Bars

 Here is a picture of the cab where I was thinking of putting it.  Note about 2.5 inches from the rear of the frame to the rear of the cab.  This was the idea, move the cab back 3 inches to compensate for removing the 3 inch long water tank. 
 Kinda like this.
 
A good plan but I forgot an important thing.  The throttle bar and johnson bar are on a stand that were centered in the window of the cab.  The cab that I was planning to  go rearward 3 inches and the stand that I sent rearward 5.5 inches.  This 1.5 inches makes the levers outside of the cab to the rear.

Yesterday I visited Robb and he made a new bar for the throttle and I started a new bar for the direction and cutoff control.  using his mill I was able to match the length and offset of the original that is seen setting on the new one in the above photo.  I used his DRO to do the math to make a longer one with the same offset and drill the holes.   At home this afternoon I used a hacksaw to remove most of the material and a bench grinder then files and sandpaper to  finish making the new bar. 

Moving the stand and making new bars is an option... but it would be hard as the wheels and springs are in the way of mounting it.  Too much engineering for me.

I will slide the cab back an additional inch.  That gives me 1/2" to overcome.  A new cab, which I kinda wanted anyway because this one sits so high, will get the rest.  Next question, how do people get into the cab?  Do they work on the tender like some locomotives or what?
Not a good plan there... the tender is almost 2" higher than the frame of the loco.  Every time I have seen that design the reverse is true, the engine and firebox is about waste high on the fireman.  I could either ignore it, or I can add a rear deck and make the loco longer. 


Also note how the boiler is now almost completely outside of the cab.  That is one very large cab for such a small locomotive.  I am leaving room to eventually reboiler the locomotive with a longer boiler.  I want to keep the gypsy setup so I cant go forward, or larger in diameter, but I can go rearward, and maybe an odd shape boiler that is taller?  A saddle tank loco might be in line?  Otherwise where is the water?

While we were at it Robb and I figured out that the water supply lines were UST threads not MTP. 

Friday, November 16, 2018

Moved the throttle

I have moved the throttle bar back 5.550 inches from the design position.  This means the throttle rod, page 236 needs to be changed from one 6.5" long to one 12.050" long.  I bought a 1/8" stainless K&S rod but I do not have a split die to thread it.  Robb has a 5-40 die.

I also need to remake part E31 the johnson rod, page 231, while the book says 1/8th mine is .107 thick and 3.825 cl to cl on the holes.  New one needs to be 9.375" cl to cl with the other direction only .300 vs the listed 3/8" 

I have a plan now for the water system, I am going with a linear system again, hand, tender axle, loco axle, bypass valve, boiler.  The bypass will go to the top of the tender as best practice, I will need two quick connects so I can release the loco from the tender. 

I am able to reuse the cab walls, all three pumps and the bypass valve, I will make the two parts above, new cab floor, new cab roof, and new whistle.  Plus the new tender, two new tender bodies (the loco will be 3 unit) new tank, new force sensor MU system. 

My punchlist so far is:
New throttle rod
New Johnson connect rod
Four new floor mounts
Two new cab floors
New cab roof with 4 bar mechanism to swing cab over loco while under steam
New whistle of a Weltyk design Most likely of similar design to this forney.
Buy new plumbing for the water system, decide is water will be connected via quick connect or other union type.
Make a new water tank
Make new body for tender
Make second tender frame (I am hoping Robb will help with that one)
Make second tender body
Buy, assemble and program the force sensor system so I can MU with my other locomotives
Paint / repaint the loco and tenders
Valve for the propane at drivers seat
Quick connects for the propane line from second tender to engine
Toolbox for oils and basic maintenance tools on the tender
Modify the truck deck / make new platform for traveling with the loco

It is tempting to CAD up all the parts I want to make and have them cut for me out of plate, the other option, without a mill is the use of a lot of hacksaw blades and files.

And Nancy asked me tonight if it would be easier to start over with a new loco?  The answer is no, there is plenty of stuff that is good on the loco, making 20 new pieces of trim is a lot easier than making 500 detail parts.

Sunday, November 11, 2018

A collection of photos

I uploaded these so I would have them all. The odd thing is that on my computer they were all the correct rotation. Here i modified the HTML to correct them, but they are still showing wrong. The photos were all taken with an iphone 5s.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21