The high today was over 100. The garage faces due east and gets the morning sun on the uninsulated door until about noon.
I got up and in 2.5 hours got one of the mortise in place. At that rate, two a day on weekends and one each weeknight. I will have them all done on Friday.
Depending how much time is spent catering to the needs of others.
So I found a new workshop.
The air conditioning increased my productivity.
The carpet was softer on the knees.
I would work on the hole a little, vacuum up the chips, and then check my work.
I was able to complete four mortise today. I set the far side on to check how well they aligned and they were all naturally within an 1/8th of an inch side to side where I wanted them, and up down with spot on for all of them.
After getting Anna from work I started a fifth one, that required marking the other leg assembly and hogging out all the holes in the garage first. I have a little cleanup to do on the fifth joint. It is a little too tight. It looks like at this pace I will have a frame together by tomorrow evening. Cutting 5 days off my morning estimation.