Today was an O scale day. I continued my work on repairing the bridge. I think I need two more session to repair the bridge. Then there is a request to modify the ends so modern double stacks will go through. I think I have done about 10 of these sessions to repair the diagonal bracing. The old was die cut cardboard, the new ones are strip wood.
I also spent some time thinking how I want to drill the mortise for the workbench. I am going to drill not router. I only have a trim router.
Yesterday I cut the legs and two of the cross beams to length.

No comments:
Post a Comment