Today I worked on more track. Starting by fixing a few issues we caused by working late and in the dark were fixed, such as the gauge being too wide around the frog, and I routed out under the frog to level the track some.
Then I moved on to laying the single track. This went much quicker. I was able to do 12 feet in one day, before I was only doing at most six feet on each track.
Because it will take some time for me to make points I am going to install a temporary plate to guide the wheels and keep them from derailing.
I now have one 60 foot long railroad instead of two 25 foot rail lines.