Sunday, November 11, 2018

Re-position Johnson Bar

Today the family went to the Lansing model train show.  Pretty crowded but not much stuff I was interested.  A photo of a 1901 civil engineering railroad of a 0-4-0 pulling a string of side dump hoppers under a crane was one item I passed up.  A book about Adirondack railroads was another.  I did pick up an issue of the On30 annual with two articles about DCC for porters.  I also bought a O scale Labelle kit of a wagon and carriage delivery boxcar.  


I helped Nancy clean up her area the last few days, move the teak to a corner of the shop, and sorted a lot of papers and other stuff.  

Then it was on to drilling and tapping two holes for holding the johnson bar to the frame.  I tapped the holes 4-40 but it was a very tight fit.  I am not sure what these bolts really are, they are 40tpi and very slightly bigger than #4.

I have noticed that when taking this loco apart some things fit better with metric some english.  

The good news is I have decided to reuse the cab, I only need to make new front panels and paint the loco from the ugly red and green.


Sunday, October 28, 2018

Pip-squeak rebuild

This weekend I took advantage of the rain and drizzle and hid in the basement shop.  One of the things I did was move some items around so I could bring down my steam engine. 

Then today I started planning the changes I want to make.

My inspiration is this Porter 0-4-0 Mattie for the Tampa Street Railway. 

My story is that a tourist line in the 1920's bought my loco secondhand.  The prior owner used it for a big civil engineering project and replaced the loco with bulldozers.

The loco will pull two cars, both 16' long, the first is the tender / baggage car, the second is a passenger car.

IE I will reuse the frame Unka Jesse had and add a second one.  The first tender will be mostly for water and running tools, the second tender will hold the force sensor for MU plus propane and other tools required.

The list of actions needed to get this thing running again is long, some things will require new skills but for the most part I see nothing impossible.


  • One of the biggest changes I am doing is moving the cab back 3 inches.  This means a new cab floor, walls, roof, and the hardest part, mounting to the frame.  Not sure if I will design on the fly or draw this thing up in CAD first.
  • Because the cab is moving the throttle and johnson bar need to move back five inches, more holes and parts needed for this.
  • I may need to add more weight forward on the loco because of the cab move, This may be in the form of a new pilot, or toolbox, or water tank, running boards, or weight under the frame.  
  • The brake lever appears to be able to stay in its location.
  • I want to add a better sounding whistle. A Weltek design with the resonator between the steam dome and the cab.  As he is local to the Michigan I may get some consulting help from the man himself, I understand that age has caught up with him and he may not be able to help make the parts.  This is the majority of the new skill area I am talking about.  I have heard many of his whistles on small scale steamers, 1000 times better than the current penny whistle.
  • More practical I need to inspect all the water pumps, I bet the o-rings will need replacing, hopefully no other parts.
  • I am going to move the water supply bypass to where it should be, just before the boiler, right now the loco's axle pump and the hand pump is starved by the bypass.  One more hose from the loco back to the tender will fix that issue.
  • I need to install a steam oil lube system for the gypsy winch.
  • Also need to buy some nice braided fishing line for use with the winch, as well as some blocks etc so I can "log".
  • I am not a fan of the red and green parts on the loco, the simulated Russian iron boiler wrap is rusty... the loco may be getting a paint job.
  • A new link for between the loco and tender, right now it is an oval and while hooking together it slides into the body of the coupler, soon it will be a link with two holes.
  • I need to replace or modify the coupler on the rear with one that is compatible with Tom Bee 
  • The foot pegs on the riding tender need to be hinged as they are too wide on the truck.
  • I need to modify the way I truck this thing around, the draincocks, valve gear, and propane system hang way down.  All my other equipment is held in place with 1x2 rails inside the wheels, that is fine when I remember to throw the bar full forward, but I catch when in the middle and I have less than 1/4" with the loco in reverse.   
  • The throttle bar is backwards of most loco's, this is confusing... if it can be changed I will do it so that others will not be confused when running this loco and I wont be confused on other locos.
  • Speaking of the draincocks, the operation is not clean, they like to bind up, if I can replace them with automatic it would simplify running.
  • Make a water tank, I am thinking acrylic so it has no chance of corrosion.
  • Make the tender and propane car look pretty.
  • Make the force gauge system so I can MU with one of my electrics.  Yes I am going to make this a steam powered throttle for my electrics, that will increase my pulling capacity with this loco.  My brother already has this for his electric, he can put anything on the coupler, I am going to mount it in this steamer and allow any of our 4 electrics, (was five but Robb tore down his first loco to the frame with no plans to rebuild.)  I may use the motors to upgrade the tugger.  

This is quite a list, many of the items have many small steps to get to completion.  I think I will design the cab in such a way that if I ever do need to replace the boiler I can use the same cab, I have 4 inches of open space to the back where the onboard water tank and wood bunk used to be that is now gone, for now this boiler stays.

Saturday, October 20, 2018

More Nail Keg Progress

 This weekend, with the poor rainy weather I choose to work on a simple project.  Nancy took some pictures of the progress.  First I started out by cutting the walnut branch blanks from Adam to length, then ripped them to angle, it takes 15 to make a circle with this setup.

 Then using the radius jig I cut the outer edge of the barrel.
 
 Sorting the staves into three grades, with outer defects, not a full outer cut, and perfect.  Mostly I had perfect but there were quite a few of the other two grades.
 Yes I wear PPE while working, I have the dust collection hooked up to the bandsaw, I need to add a second intake around the lower guideblock to improve dust collection.
 
 The next step is to cut the ends to thickness
 The fence is setting the thickness, a shim to help set square and a stop block to set the length.  I did end up making them a little long. 

Afterwards change the fence setup and cut off the waste.

The end result with glueup was 7 additional kegs.  I need to add wire bands and ends to finish them.
Setting them on the SBT I am estimating I need about 50 kegs total to make a full load.
I am not sure if they will be loose...and risk having them fall off on rough track or if I will attach them into one mass. 

Monday, October 15, 2018

working railroad

 Pictures out of order again for the past month.  First off is one of the first days of using the railroad as a working railroad since I have very few derailments.  The last task of the day was moving some paving stones and gravel to make a step in the path over the mainline and spur to the carbarn.
 Lillian colored a picture of the SBT
 Loco 2 is back on the rails... Because....
 I had a major derailment.  The rail joints These two photos are several weeks old but exhibit why I did not want to have a golden spike ceremony... I still get some derailments in this spots. I need to bend the rail up at the joints, I will need to make the tools Bill has to level the track.  Using a tamping rod, as well as an air chisel as a tamper to compact the soil I am using.
 Back to the weekends work.  We had some unwork, Maple dug up a witch hazel.  freshly watered.  She did this four times in one spot over the course of the day.
 Nancy waters the plants with water brought by train.
 Filled at the far end of the railroad.
 The lumber used to mark each hazel was brought to the shed by train, then after they were built back out by train.
 Seven total.
 After Maple digging and killing one we have 4 witch hazel an oak and a white pine.
 Another task was logging, the whole logs were brought by mule, (parents) or by train to the sawmill, (shed) to be cut into sections and loaded onto a train car.
 A total distance of 50 feet by rail, but fun all the same.
And Lilly and the parents rest inside.

Monday, October 01, 2018

More work

 I visited Fred, a member of the small scale live steamers and he let me run one of his locomotives.
 Nancy helped me add a grounding rod near the shed.  8 foot long, we hammered it in.
 I have started work on my steamer.  I am redoing the water supply system.  The plan is to have a three unit train.  The loco, a boxcar, and passenger car.  The passenger car will hold the propane tank, and the box car will hold the water and tools.

 Work continues on the track.  Well I am posting out of order, I placed the no8 switch to provide a spur in front of the shed.
 I also saw one of the great lakes freights heading south while driving into work.
 And Lillian is now willing to touch little grey, she carried him and encourages him to sleep on her bed each night.
 Another few pictures of the last section of track.
The plan is to install a diamond from the shed spur and temporary track up to the garage as a loading and unloading tracks.

Saturday, September 22, 2018

Completed Circle

 This is a neat looking building of Freesoil Michigan
 Putting together in one place all the steps of maintaining track.
 Sight down the rail to check for grade issues
 This tool pulls up vertical kinks

 This tool is for leveling side to side, with the level behind it.
 A power brush for leveling the ballast
 more pictures of the level
 Note the flat wheels not tapered

Have a railcar to hold all the tools.
My version of the level. I skipped the wheels and went with nylon blocks with flanges.  Two RV levels.  The near end pivots easily, the far end is fixed to the two by 6.  It works very well to help me level the track. 
After putting the in the crossing plate I was able to complete the loop.  But the trouble was I had done it on the uneven ground.  Nancy bought three yards of top soil to use as fill / ballast.  the reasoning is that I can pull up the track and nothing will remain of the track.  The rail I planned to install this year was completed Sept 22.  I added a parking track in front of shed for the loco and log cars. 

Saturday, September 15, 2018

Crossing

Today I worked the grade crossing.  I dug out a trench for each side of the C-channel.  I hit once spot of waste concrete, broke it apart with a sledge.  It has a bit of grade so that I don't have to have as much grade on the curves before and after. 

I worked on the track, at the start of the day the train with derail about 7 times per loop around.  At the end of the day Loco 2 and two flats make it around at speed step 4 the whole way except at one spot.  The goal is to have the coal car, my worst running car run both directions at least at speed step 8.