Tonight I continued the installation of the electronics. I drilled and mounted the four switches along the bottom, dead man override and forward direction on one side and radio power and MU master slave on the other.
I also mounted the headlight module, even though I do not have a headlight.
Last was starting to run the wires between the components. I am trying to do as neat and organized job as I can. It would be nice to hide the wires in a box, but I did not plan for that.
Wednesday, January 31, 2018
Loco 2
Monday, January 29, 2018
Loco 2
Tonight I spent some time planning out the wiring for loco 2. Where to put the switches and what style to use.
Sunday, January 28, 2018
Loco 2
Today before helping Jon with his 100 day of school project I made a block to hold the radio plug to the rx. This solves the issue of the module working loose as the loco traveled down the track.
Saturday, January 27, 2018
Loco 2
Work continues on rebuilding.
Last sunday the end panels were glued in. Friday the floors and milk bottles were stained the same color as the SBT top.
This morning holes were drilled in the frames for bolts to stablize the milk bottles.
This afternoon work was begun on reinstalling the electronics.
Sunday, January 21, 2018
Loco 2
Today I sanded the wood and planned where to drill holes for strengthening the milk bottles to the frame.
Saturday, January 20, 2018
Loco 2
Today I picked up the new battery straps from the mart of wall, our free shipping was negated by the purchase of a dog coat.
I then drilled holes through the plywood and cut a channel for the strap underneath.
Next I sanded everything.
There was a break in the activity to visit Dick's railroad for an op session.
Monday, January 15, 2018
Loco 2
Did a little more work on Loco 2 tonight. I cut the end panels to fit in the milk bottles. I also cut out openings for the trays. I am reusing the one from before and making a larger one for the other end.
I am going to upgrade the battery hold downs to straps from the hook and loop tape, this should give a bit more holding power.
Not to much accomplished tonight.
My assistant had a ball.
Saturday, January 13, 2018
Loco 2
In a case of productive procrastination I have started to work on Loco 2.
Replace the milk bottles and add new ones at the end that did not have them. This will most likely cause the current cover to not fit.
Add new pedestal keepers that allow the needed travel for quality operation.
I also plan to install the MU connections in each end. This will cause the need to revise the electronics.
Thursday, December 28, 2017
Rail Joiner Install & Christmas run
First I tried in the deep snow, but the hole alignment was slightly off.
After it melted some I brought a drill out and fixed the alignment and got the eight bolts tight.
Testing proved the solution to be well designed, not a single derailment in that area anymore. The tugger did hit a brick by the log loading area.
Later in the month I swept the track and ran the train both on Christmas day, and while hosting my brothers. I may run one last run on New Years Eve or Day then I will be bringing the loco and tugger up to the garage until spring.
Christmas brought me fun toys, a wav / mp3 player, an arduino mini, a 9DOF location recorder and a display screen. Plus I found a facebook video advertising a 109db amplifier for use in S scale loco's it should work for the SBT.
Sunday, December 17, 2017
steamer
I ran out of other projects so i started looking at the water system of the steamer.




