Sunday, July 27, 2014

battery cover

Saturday and a little today I made a cover of 12 crates to enshroud the batteries.  Each crate is 22"x34"x16".  Nancy and I think it looks good, we are wondering if we should paint them or label them.  Are they outbound finished product or inbound material?

Thursday, July 24, 2014

Pretty Battery tray

Today I started work on a better looking battery tray.  I mounted six 1x1 aluminum angles to the wood deck I fixed earlier.  Next I will make a wood box to cover the batteries.  Then I will decorate the wood box to look like a load as found in a factory.


Here are some factory pictures for inspiration.



Sunday, July 20, 2014

Lever bracket

The first direction lever bracket I made did not  hold onto the machine well enough.  I am making a new one, c shaped bracket.  A bunch of time with the dremel, benchgrinder, a file, and sand paper.  This went faster than I expected.  Next to drill the pivot hole.

Saturday, July 19, 2014

Successful Test Day

Almost six hours to load a van, because it takes time to add wheels to the lift, carry everything upstairs and make rails on the lift and in the van.

 Another two hours of driving, just to test the train for ten miles.


 Testing with many cars, and with few.  Forward, and backwards.  It worked quite flawlessly.

 The tugger derailed once when empty on a stick.  In the past it would derail if it was looked at crosswise.  Two scooter batteries under the frame helped, plus they power the headlights.  Also the flat and gon ran well.  I added a washer at one end and a lube ring on both ends made from milk jug plastic.  I even pushed them around the track backwards without issue.

Then after a few hours it was time to pack up and head home again.  A long two hour drive home.

Tuesday, July 15, 2014

Fixing

I let Robb use the train for a while.  Jeff had brought it to Michigan after the IMLS spring meet, Robb installed two different radio control systems.  The first one worked great for him at White Creek, the second a RCS system was not working that great when I took the train back when I was in Michigan The first week of July.  After avoiding the machine for a while after a bad derail at ILS there was some work to do.  Nancy is touching up the paint , I fixed the warped top and removed the pendant throttle with a cut wire that was causing unexpected full accelerations.

Some other things to do:
Make a new holder for control lever that is more firm
Make an emergency switch, a magnetic release or something
Make the second top.
Buy a new amp meter and rewire power source to be 5V from radio control
Make a crate to fit over the batteries.
Make some mudflaps from ice cream containers
Test the train this Saturday at IMLS
Make a crate that holds stuff and is attached to the flat car if Nancy wants a boat seat along
Pack for the trip to Coshoctan that starts in 23 days.
Put milk container washers on flat car trucks.

Wednesday, June 18, 2014

Railcar storage shelves

Today we cleaned up the garage, placing stuff on the car storage shelves.  After the floor was clear I parked both red vehicles in the garage.
Jonathan's car had pleanty of room.  Clifford....
Touching the shelf with the back bumper.
Three inches to spare at the front.
But he fits

Saturday, June 07, 2014

IMLS Videos

Here are a few videos of me or my brother Jeff running the Storage battery Truck Saturday morning at the IMLS 2014 spring meet in Mt Pleasant Iowa.










Here the cameraman got a cab ride.



Thursday, June 05, 2014

Load The Van

Friday we leave for the third track that will host the train.

The first two the van was set up as a two passenger vehicle.  This time we wanted it to be for five passengers, and the train.  So Nancy and I set the storage battery truck inside the gon, set a flatcar on top and rolled it into the middle of the van.



To make it easier we set up cribbing to work from.  It was not easy to get the SBT in the gon.  First we lifted it and set it on cross piece near the top, then we ran straps under it.  And while Nancy and I stood on the cribbing and lifted Anna was told to quickly remove the two cross braces so we could set the SBT inside the gon.  The issue was Anna confused quickly with carefully.  She moved very slow while we yelled at her to move faster. 
The plywood used here is the same one used last time in the back of the van.  I cut is narrower.  Now I can use this half as a five seat van with the wide part of the third row down or as we have it here in the center of the car.  Our thoughts are that by having the heavy train forward the van will ride better.  This is also how we plan to set up to go to Coshoctan in August.

Like before holes were drilled at the seat mount points so that I could strap the train down.
We stuck the large batteries and the tugger in rear trunk.  I don't think the tugger will make that trip, it is too large.  I might make a low side gon top to go on the frame.

One last picture from a week ago.  We got rid of all the old clay soil to the Easters farm and then got 3 loads of compost from the city to fill the trench and coat the front and back yard with an inch. 

Wednesday, June 04, 2014

Pictures from yesterday

Here are the pictures of the failed journals 
  The one on the left failed from the axle coming out.  rubbed against the bearing and teardropped the wood.

The one on the right was from the last derail.  Not sure what happened there, weak wood or something.  I admit the bearing looked fine so I reused it in the new block.
And today I did not take pictures.

Also today I assembled the trucks.  One of them had so much play from the bolster to side frames that the bearings would fall out of the wood.  I fixed that by making a new bolster.  Now I have 3 great bolsters, a good bolster and no bad ones.  The good one has a lot of play but i could not get the bearings out of the wood.

The batteries are charged, the trucks are made, now to get the van back and fill it with everything important for the next trip.

Tuesday, June 03, 2014

remaking the trucks

Today I installed the wheels on the axles that Robb made as replacements for the ones that failed.

The picture shows a raw axle, the two failed axles, and the two new ones from Robb.

Another task of the evening was to try to push off the wheel that was spinning on the axle that came from Eaton so I could lock tite it in place.  Could not get it off more than a 1/8th of an inch.  I figured that was enough so I put a drop of lock tite on and pressed it back to the shoulder.

The last task of the night was to make 4 wood journal blocks, two to replace bad ones and two as spares.  Tomorrow I can bolt the trucks back together and check to see if the other set is good.

Nancy and I had a date night while Kayla watched the kids.  A visit to Panara for food and Menards for wood for the new top as well as faucets for the rain barrel and free* plates and a quart of red mistint paint.

*purchase for $2 each, and get a $2 rebate so all that is paid is the sales tax.  We bought 4 to use as gift holders.  Already gave one away to Kayla with a large chunk of graduation cake.  With Nancy it will be easy to give away the rest under cookies and other treats.