Wednesday, June 18, 2014

Railcar storage shelves

Today we cleaned up the garage, placing stuff on the car storage shelves.  After the floor was clear I parked both red vehicles in the garage.
Jonathan's car had pleanty of room.  Clifford....
Touching the shelf with the back bumper.
Three inches to spare at the front.
But he fits

Saturday, June 07, 2014

IMLS Videos

Here are a few videos of me or my brother Jeff running the Storage battery Truck Saturday morning at the IMLS 2014 spring meet in Mt Pleasant Iowa.










Here the cameraman got a cab ride.



Thursday, June 05, 2014

Load The Van

Friday we leave for the third track that will host the train.

The first two the van was set up as a two passenger vehicle.  This time we wanted it to be for five passengers, and the train.  So Nancy and I set the storage battery truck inside the gon, set a flatcar on top and rolled it into the middle of the van.



To make it easier we set up cribbing to work from.  It was not easy to get the SBT in the gon.  First we lifted it and set it on cross piece near the top, then we ran straps under it.  And while Nancy and I stood on the cribbing and lifted Anna was told to quickly remove the two cross braces so we could set the SBT inside the gon.  The issue was Anna confused quickly with carefully.  She moved very slow while we yelled at her to move faster. 
The plywood used here is the same one used last time in the back of the van.  I cut is narrower.  Now I can use this half as a five seat van with the wide part of the third row down or as we have it here in the center of the car.  Our thoughts are that by having the heavy train forward the van will ride better.  This is also how we plan to set up to go to Coshoctan in August.

Like before holes were drilled at the seat mount points so that I could strap the train down.
We stuck the large batteries and the tugger in rear trunk.  I don't think the tugger will make that trip, it is too large.  I might make a low side gon top to go on the frame.

One last picture from a week ago.  We got rid of all the old clay soil to the Easters farm and then got 3 loads of compost from the city to fill the trench and coat the front and back yard with an inch. 

Wednesday, June 04, 2014

Pictures from yesterday

Here are the pictures of the failed journals 
  The one on the left failed from the axle coming out.  rubbed against the bearing and teardropped the wood.

The one on the right was from the last derail.  Not sure what happened there, weak wood or something.  I admit the bearing looked fine so I reused it in the new block.
And today I did not take pictures.

Also today I assembled the trucks.  One of them had so much play from the bolster to side frames that the bearings would fall out of the wood.  I fixed that by making a new bolster.  Now I have 3 great bolsters, a good bolster and no bad ones.  The good one has a lot of play but i could not get the bearings out of the wood.

The batteries are charged, the trucks are made, now to get the van back and fill it with everything important for the next trip.

Tuesday, June 03, 2014

remaking the trucks

Today I installed the wheels on the axles that Robb made as replacements for the ones that failed.

The picture shows a raw axle, the two failed axles, and the two new ones from Robb.

Another task of the evening was to try to push off the wheel that was spinning on the axle that came from Eaton so I could lock tite it in place.  Could not get it off more than a 1/8th of an inch.  I figured that was enough so I put a drop of lock tite on and pressed it back to the shoulder.

The last task of the night was to make 4 wood journal blocks, two to replace bad ones and two as spares.  Tomorrow I can bolt the trucks back together and check to see if the other set is good.

Nancy and I had a date night while Kayla watched the kids.  A visit to Panara for food and Menards for wood for the new top as well as faucets for the rain barrel and free* plates and a quart of red mistint paint.

*purchase for $2 each, and get a $2 rebate so all that is paid is the sales tax.  We bought 4 to use as gift holders.  Already gave one away to Kayla with a large chunk of graduation cake.  With Nancy it will be easy to give away the rest under cookies and other treats.


Monday, June 02, 2014

I See

Today I visited the local Walmart store after work.  Visiting a Walmart is a once or twice a year event in my life.  I might visit a Target about twice as often.  The goal of my visit was a driving light I saw on a plum cove GE while at Heston.  This beehive style light looked appropriate for use as a headlight on the storage battery truck.

To mount the headlight I made a little oak block that fits inside the riveted on bracket.  A screw from the bottom holds it to the running board and two stainless steel screws bolt the light to the wood.
I have not wired it up yet.  Leaving that one to Robb.  He is hoping that Jeff will take the storage battery truck to Michigan so he can play with it at a White Creek open run.  I said he would need to wire up remote control if that was the case.

Some of the other things I want to do. 

Make a new top without a warp
Attach the control stick better
Install the switch for direction control
Install radio control
Make a wood crate to fit over the batteries
Make riding crates for the flat cars
Put together a basic toolkit to travel with the train
Make and install a builders plate

My other purchases at Wally's World were some bottles of acrylic paint that was on clearance and a small journal that will fit in the storage battery truck to log the events in the life of the little loco.



Tuesday, May 27, 2014

running my train...

to death?
Oddly enough for running my train from 5pm to 10pm on Thursday and Friday and from 9 to noon on Saturday I have only one picture on my camera, the one of Robb with a Saturday passenger train shown yesterday.  35 miles were put on the train in that time.  One hour, 4 miles was with the small batteries and me sitting directly on the truck.  Talk about a fun way to inspect the track.  Flying on a magic carpet.  I could tell that the track was made on a panel with a slight turn at the end, shhhhhhtik  shhhhhtik every ten feet. I never noticed it while on the bigger train but sitting on a little four wheel close to the rails it was very noticeable.  I will say the track was quite well maintained, and I could tell newer than Hesston.  (The first section of this track was laid 20 years ago and is showing some wear and different construction methods.)
The engine ran very well the entire time.  Robb rewired it on Tuesday and Wednesday to add an amp meter.  Amp meters have very large shunt that needs to be electrically insulated.  While he wired I made a dashboard from a small wood box from Michaels, it hooks up to the truck via cat5 cables.  We will probably be wiring the unit one more time to install radio control.  Currently the control board is a pacesetter.  Robb purchased a 4QD thinking it would be better.  Several people at the meet said the pacesetter board was better than the other options.  We do want to play around to see if we can extend the range of usefulness of the throttle.  Currently it is 1/4 deadband, 1/4 useful and 1/4 way too fast.
One of the first areas of the railroad, and few of the open areas, most is in the woods or swamp.

While the truck ran nearly flawlessly.  I can't remember any problems with it. We did have some trouble with the cars.  The way the axle were made the bearings are at the outside edge.  Then the side frames have enough play to move in and out the full thickness of a bearing.  Yes, you guessed it, first on the blue flat an axle came out of the bearing, grinding down the end of the axle destroying the bearing but the wood block was fine.  Another railroader there saw our problem on Friday night and suggested installing washers or o-rings to make sure the bearings stay on.  We visited tractor supply and bought both, installing washers Friday night and ran for a long time no problems.  On Saturday the same failure occurred to the gondola, this time one of the wood block crack during the derailment. It actually failed within 1000 feet of loading into the van, if it had not we probably would not have taken a better look at the trucks until I was back in Iowa.  Robb decided that we should follow the other suggestion we got, mill the shoulder over an 1/8th of an inch on each side to have the axle extend out and the bearing in some.  He started the project while I took a nap on his couch.

Speaking of naps....
This is from Tuesday.  I used to sleep in the same spot with mom when I was a little kid.  Mom is watching a cooking show on TV and Lillian slept for several hours.

So while he milled axles on the lathe I re installed them on the trucks.  We chose to replace the two damaged axles wholesale.  I will also be replacing two of the wooden journal blocks that were damaged.  The bearings are held in the new inboard position by o-rings.  I plan to inspect the cars more often than every 60 miles until I know they are good.  In other bad news three of the nuts that hold the trucks together were missing.  I will be switching all the nuts out for locknuts or using locktite.

It is hard to sit cross legged for a long time, sitting like a chair is better.  Even padding on plywood gets hard, use good seats.  Sitting in a gon traps your feet, not easy to get out to switch, etc.  A flat car with a milk crate, or boat seat is better.  The long riding benches are good for passenger riding cars.  I plan to make up some crates to go onto our flats, they will double as toolboxes, the top will be wood, then a kneeling pad, then the foam cushion, then some cotton batting, and then the actual cover.  The larger the seat the better.  For some of the time I ran while sitting on both gondola seats.  These short cars are hard to load two people into, better to have one or one and a kid.

Make sure to wear sunscreen and have enough water.  Also dress for a breeze, riding the train is like sitting in a constant 4 to 8 mph wind.  I also like wearing safety glasses and gloves.

This is definitely something I would do again.  A good use of two vacation days.  I was within 15 miles of the ILS track Sunday on the way home, I chose not to stop off, I should have though.  The IMLS spring meet in in ten days.  The whole family will be going down there, meeting Jeff and Barb.

Monday, May 26, 2014

28 hours of trains

Robb and I took two days off work to play.
 We went to White Creek with my train and ran with Jerry all day Thursday, starting at 9 am until about 5pm.  Robb, Jerry and I traded off doing the different jobs.
Conductor, Engineer, and brakeman.  We rode around the layout setting out cars at industries and picking up cars at other industries.  This one shown here is Samson Manufacturing.  We went out four times on Thursday, and Jerry and I went out three times on Friday, Robb joined a different crew for his three runs.
We start out with 5 cars from the yard, each with a card listing which industry in which town to deliver to.
 We plan our route, dropping and picking up as we go.
 Some are easy trailing point others require runaround moves, using gravity, and in one case a flying switch.
 The sections of the railroad between towns are single track.  To enter one the engineer requests permission from a track side control stand.  This turns the signal red at the other end eliminating cornfield meets.
 There were up to 15 freight trains, 4 passenger trains, and two yard crews working the railroad.  The freights needed to make sure they were clear of the passenger trains which ran on a time table every hour.  It was a blast.

What did my little train do?  Well it is not strong enough to pull a five car freight.  But it could pull some passenger cars.  On Saturday, while I helped out in the yard Robb ran three different passenger train runs.  I ran with him on the last one.  It is quite a challenge making sure to go the correct route, obtaining and releasing signals, and keeping on time.
Those two passenger cars were quite a challenge for our train.  They have bronze bushings, not roller bearings, so they are hard to pull.  I am glad to see that the loco kept up, even as the voltage dropped and the amps climbed towards the end of our time there.  I will do a second post about running our train.

Saturday, May 17, 2014

Family fun day

I let Robb and my parents drive the train around.  
 I drove the train sometimes too.
 We got Lillian to ride in the tugger for one trip around.
 Even dad drove the train.
We put over 20 miles on the train today.  There were some derails, mostly due to improper loading of the  cars.  We did have a problem with a switch with wide gauge.  Towards the end the circuit breaker kept going, we were told this was because the voltage in the batteries was low.  I did not charge the batteries tonight and plan to run around a lap or three tomorrow.

Friday, May 16, 2014

It is ALIVE!!!!




Today the train got on the track for the first time.  It ran well.  First time around I ran it without any batteries in it.  It did OK, struggled on the hills without extra weight.  I sat on it to help on the next time around and found a dip in the track and derailed the front axle, I think my weight was too far rearward.  I put the small batteries in and had no trouble after setting Jonathan's riding car on a siding.

Five times around and the large batteries were at 27% ... that makes me a little sad, I was hoping they would be higher.  Tomorrow we will see if I have life at the end of the day.  I plan to also use the small batteries also from full to empty.