Thursday, September 15, 2022

Unnecessary cat feeder

Nancy and I finished our cat feeder.  
I also finished the bridge
The feeder is because this cat cant jump.
I bought six more wood tippers.  I only have 39.  I think I need a few more to have at least 42.
The top is rough barn wood with colored epoxy pours over it.
Mini P enjoying her last few days on earth.
No not more hoppers yet.   The couplers overhang so they could not be shipped like this.
I was asked to do another project.   Anna wants shelves to hold plastic shoe boxes so she can standardize her storage.
I decided to make three 26 inch by 43.5" shelves that stack.  
I also made another styrene carved person to drive my battery loco.
I also made a box at bumper height so I can roll the coal car out and show it off at a reasonable level at the plano show in a few weeks.
I stole the casters off a skate and a box that held scrap wood at the old house and was unused here.   The rail is one of the decks for the van screwed in place.
A solar powered refrigerator in africa.  I should have built my shed this way.
Anna paid cash for a car.
Anna got the idea for boxes from here.
Here are my new tippers.  One is missing a wheel and another is missing hinge pins.  Not sure if I can get that glued in load out.  Three of them have ho scale link an pin couplers.  I like the idea but those feel undersized.
We have had a hamster for a year.  She looks wider than she is tall sitting like that.
At least we have a cat for our feeder.  Even if he can jump up so we could feed him on top.  
The front of the case.
This will become a bed frame.
All the wood for the shelf cases.  Two are glued and nailed.
Robb was camping at white creek for the week.  He was also running trains.
I designed the ends of the shelves to have the same grain top middle bottom.  
To cut the backs I wanted to not do it over my new workbench.  So I made brackets from magnet bars to hold the far side.
The unpainted figure sitting in the loco.
Nancy helped make the cat feeder by doing all the finishing and helping make little brackets to hold the top to the body.
The sides close together.
All my tippers on my layout.  


 I also spend some of my Saturdays working on the bridge and underlying scenery.  

Monday, August 22, 2022

Done

I completed what I want to do to the bridge.






Look for this machine for sale on the web.




 

Friday, August 12, 2022

Closet shelves

 

For years I have wanted better partitions in my closet.  
I saw a 4x5 piece of mdf at curbies a while back.  It was only 1/2" thick.  The rest of the closet is of 3/4" stuff so I worried it would not be strong enough.  I finally gave in and decided to use a break in the weather to make it.  
The day before I used the break in the heat to add the ledgers for the bottom shelf.   They are rabbited in to have a nice solid purchase and great weight holding.
I need to add a scratch coat to the SBT to see where I need to touch it up.  
This is what a break in the heat looks like.  An hour and a half of afternoon 
Nancy worked on the cat feeder.  
One bay will of course be a cat condo.
Total project time cutting, installing, sanding, and two coats of paint took about 8 hours.  

Here is a before for the shelf support.
the back engine is the before for my SBT.

Saturday, August 06, 2022

Storage Battery Truck

Another out of order story 

Then smash it.
A place to drive.
The coupler end.
Side view
Find one.
Another side view.
An end view.
Set it on the plate.
Glue it inside.
And let the dog run in the morning.  An empty lot in the industrial complex.  She found a way inside the fence of a neighboring building and taunted me because while she was tired of running she did not want to get in the van and go home.

I also worked on the bridge,  One end is now all glued in place, waiting for the plates.  The other end has the diagonals.  I want to wait 24 hours before adding any of the other parts.  I think I can finish it all with one more Saturday session.  It will be nice to be done with that project.