Wednesday, August 22, 2018

Choices

It has been slow on the railroad after filling in the dirt.  My hand was hurt and I am forcing myself to not overuse it.  


After a week my hand felt better so I tied the newest turnout to the end of the line.

Another week and I added a length of track to each direction.  

I have decided to have the mainline be the route closer to the lot line, then curve around to the deck.  The inboard track will be the siding, with an eventual diamond and track leading to the garage for loading and unloading of trains.  

I am now out of ties, I need to cut down my boards to make more.  

I am trying to decide if I need a heavy duty crossing for a vehicle to pass over.  

Saturday, August 11, 2018

Fill it all in

Today we started the morning gluing up the PVC conduit to the shed, and putting it into the trench, then we backfilled, everyone but Anna.  We put a red tape "electrical below" tape six inches below the surfaces.

Now I need an electrician to help me connect the wires properly. 

Thursday, August 09, 2018

Illegal in California

Tonight I continued trenching for the electrical.  I used a method frowned upon in California. 

I used a pressure washer to blast through the problem areas that the ditch witch had.  For over an hour that was the hardpan around the well head.  I think it was the stuff from the well hardened up, once I was able to get through that it was easy going at the other few area.  I sure got muddy though.

Now the whole route is at least 18 inches deep.

While I "dug" nancy rolled out the wire and cut it into four equal sections.  It is long enough to get from the shed to the shop electrical box.  I will have to find out if I can tie in there or I will have to have a junction and tie in at the main.

I plan to run four #6 aluminum wires.  I would also like to run a 14/2 to have the ability to turn on and off a light or such at the shed.


Carbarn Upgrades

The last few weeks I have been working on the shed / carbarn.  I added two windows to the east side.  I used pallet wood to add two 3/4" layers to the floor, the top layer was all 1x12 pine.  We then raised the grey shelf so the wood scrap trash cans would still fit underneath.  Then I added a single 5/8" floor over the ties, just the first 5 feet by the doors and the remainder of the inside track.  Maybe later I will get more wood to do the rest, or just leave it.

Yesterday I started digging for electric to the barn with a pickax.  It was not that difficult, The first 2 feet took a half hour.


But a doctors visit is $120, rental of a ditch digger is $150.

So Nancy rented the digger tonight.  She got it about six, we ate some chicken nuggets then about 7pm I started.

The first time it balked was a tree root about 1 inch in diameter.



The second time was a baseball sized rock



The third time was a softball sized rock

Then a football sized one


Then a beach ball

I have no idea why there are rocks the size of small cars buried in our yard, but rather than break the machine I stopped with the trench.  About 80 feet to an average depth of 18 inches.  A two foot length is only 12 inches deep, it is near the wellhead, maybe it is waste mud from that drilling that cemented.  Most is 18 to 24 inches.

I found that the machine works better when the arm is down all the way and the two largest rocks at each end was not letting me get deeper.  I might try using the pressure washer to blast down.

I did try using the shop vac to pull the loose dirt out of the trench, that worked well, a good task for children to work on tomorrow.

The last thing I did before putting the tool back on the trailer is use it to start a hole for a bush that needs to move for the siding that will be going up the hill.  I have a plan to use the #8 switch to the east of the shed with a parking track to the west that I can add temporary track to the end up the hill into the garage.

Saturday, July 14, 2018

Running Pip-Squeek

So I brought the Falk to White Creek fun run.  Robb took advantage of it and hooked up the propane and got it running.

https://www.facebook.com/ryan.devries.140/videos/1855314234489447/


https://www.facebook.com/ryan.devries.140/videos/1855245827829621/

Since Nancy and the kids were out of town I was forced to get the train up in the truck on my own.


I chose to have it drive itself up the grass to the edge of cement, then I lifted it and ran it up the loading ramp onto the lift, then into the truck.  I got the loco, tugger, two flats, brake car and the steamer in the truck with the lift, and at the last moment added the wagon.

The wagon was a hit on facebook, over 100 likes.  Or maybe running a Falk was a hit, over 100 likes.  Or my brother was a hit on facebook, over 100 likes.

I decided to name the loco Pip-Squeek as a mis-spelling of the name uncle Robb calls my son. 

I love the nice deep stack sound from this loco, it is simple to run, water, oil and heat.  Like I was told it is a short runner, about 300 feet max and it needs more steam.  Should be fun on my home track.

The 1988 Jan-Feb and Mar-Apr NG&SLG has information on the prototype engine. 

Sunday, July 08, 2018

More mainline

my view the last few days
A few cool days encouraged activity in the backyard.
 In this case it was extending the rail 36 feet further. 
Beside more fun for the kids this brings the track to the gravel under the deck.  I plan to use this to build up the ROW at the other end of the line. 

Wednesday, May 23, 2018

White Creek Spring Switching

 Robb and I ran at White Creek.  The first day we had Rick helping so we had a 3 man crew.  Robb loco had a fault with the brake interlock and kept stalling so we used mine as the master, his as slave, but kept his remote on for horn bell and headlight.
 Friday was much better.  We figured out that low voltage in the caboose system was resetting the controller, turning off the brakes.  We were able to use my brake car with less errors. 

Our train the first day was the tugger, robb's boxcab, a riding flat, my loco 2, another riding flat, the five freight cars, another riding flat, the brake car, and a caboose. 
This is a photo of a drum I picked up in india.  It is designed to be a throw away item, but I had it for quite a few years, then we move the drawer it was in over a heat vent, that dried out the skin top.  We decided to take a picture and let it go, I put it in the pile of ceramic items in the yard.  
Last, this is a picture of my train at the end of EPRR under the high bridge.

Saturday, April 28, 2018

EPRR

Robb and I braved a long 10 plus hour drive down to Dunlap Thursday afternoon / night so we could play trains at EPRR on Friday and Saturday.  Then we took a long drive home Sunday.

He brought his loco, a riding car and his new caboose.

I took loco 2, the brake car, a flat and the new tugger. 

the tugger works well when momentum and hills are in favor.  It does not work well for starting or climbing long hills.  I ended up treating it like a scooter and giving it a running start in several places.  When it works well it is extremely fun!

The odometer on loco 2 said we only did a few miles.  I can't believe that... I think the loco went around the whole railroad ten to 12 times the whole weekend.

On their annual runaway car contest Robb beat any of my guesses by a long shot.  The car only rolled a few hundred feet, I had my farthest marker a mile away.

Sunday, April 22, 2018

first run weekend

Saturday I took my trains over to west michigan.  After checking out an auction I went to White Creek to meet with Robb.  While I did not help clean up the railroad much I did take the tugger, brake car, blue flat, and Loco 2.  I some how managed to get the TX to change channel and pipe... Robb fixed it.  I guess I am missing a switch that would make setting a new pipe easier.


The tugger works.  It has a lot of momentum.  It does not have enough power to start out very well.  It does not have enough brakes to stop.  But it made it most of the way around White Creek as long as I had momentum on my side.  That includes up to Apple Tree and up to Avalanche.  It did have trouble up the little grade before sleepy hollow.  It has trouble starting out on uphills.

I am not sure what my long term plans are with it.  I don't think it is safe for kids as is.

Sunday I visited the NAMES show and dreamed about little power plants and bought a few magazines plus some radius and angle gauges.  

Saturday, April 14, 2018

Tugger works

Today I installed the rest of the tugger wiring. 

 And programmed the sabertooth.
Right now the only signal source is the MU plug.  A 3.5mm TRRS with 0v 5v speed and direction signals.
 I have both the ability to multiple unit with my other loco or use a simple tether remote.  When hooked up to the other loco only one should supply the 5v to the MU line, so there is an on off switch.  Second is if the loco's are confused which way is forward (fighting eachother) there is a switch to change which way is the head end.
 I use the sabertooth in user mode.  This allows me to have quite a bit of logic in the controller.  For example here is where I am having the head end choosing happen.  Take A2 and look at S2, if S2 is above 2.5 volts go one way, if below go the other.  Note the A2 signal is flipped (from 0v to 5v or vis a vis) as needed.
 This above is fed in as U1 to the A1 signal to set the direction to two maps one ramping to forward another ramping to reverse.
Pine Ridge shops is working on a slightly different project.  I hear it interfaces with the arduino controllers we already use.