Our time at the convention went well. The only derails appeared to be loading or track related not equipment based. Over the three days that the loco was ran 53 miles were added to the odometer.
Lots of other steamers and such there also. Some with short trains, some with long.
Friday, August 22, 2014
Good train running
Friday, August 08, 2014
Travel
To fit the five of us, our luggage, the gon, the tugger, the flat, and of course the Jeffrey Storage Battery Truck in the van takes some work.
The SBT goes into the gon, with support stuff stuffed around.
The flat is turned over and put on top. These three are rolled into the van where the middle two seats go. To protect the floor there is a plywood with 1x2 rails. This is strapped down to the seat mounting pegs. Hopefully we do not get into an accident, as that is a heavy load.
The kids get the third seat. Yes it is a challenge having them all so close to each other and so far away from us. Good thing I have a pretty convincing stare. And I put the computer / DVD player on the railcars, sound over the stereo system and they can watch a movie. Quite a treat for our normally DVD free van.
In the trunk area are two batteries, the battery cover and of course the tugger. We skipped the suitcases and packed the clothes around the tugger in ebags packing cubes. (advice to anyone that travels with family, buy one pattern of ebags cube for each person, it is easy to find each person's stuff.) I do wish the batteries were either centered or farther forward in the van, but I do not have a good, safe, place for them.
Oh I should mention that the best way I found to wedge the car to limit rolling is to place wedges between the wheels. I did 3 of the 4 truck points.
In a few years, as the kids grow I can see us transitioning to the more traditional trailer for trains. But for now, with the small van, and small kids, this works.
Sunday, August 03, 2014
Straps, ammeter, and mudflaps
Then Nancy did not like some varnish drip marks on the top. So she sanded it.
Stained it.
Stained it again.
And again.
She will start varnishing tonight after 8 hours of dry time.
While she was fixing the top I decided that I should install mud flaps. This is good as steamers drop oil and water, if it gets kicked up and onto the control board I will be in trouble. I suppose this will help if I run during or after a rain, or a sprinkler, hose, or spilled drink.
While the flaps are steal they are held in place with duck tape. I will have to remember to bring more in case I need to do a field repair.
Saturday, August 02, 2014
New wood top
Of course there are other things that need completion. Wire up the headlight, install a new arduino based control system, touchup the paint, make the spiral spoke riding cars, and make a second larger engine. But as of now we are ready for the Buckeye Limited.
Tuesday, July 29, 2014
Control stick #2
They have some odd looking horses in these parts.... gauge is a little narrow, and the troller pole is up. Better tell that engineer this is SBT territory.
Sunday, July 27, 2014
battery cover
Saturday and a little today I made a cover of 12 crates to enshroud the batteries. Each crate is 22"x34"x16". Nancy and I think it looks good, we are wondering if we should paint them or label them. Are they outbound finished product or inbound material?
Thursday, July 24, 2014
Pretty Battery tray
Here are some factory pictures for inspiration.
Sunday, July 20, 2014
Lever bracket
Saturday, July 19, 2014
Successful Test Day
Almost six hours to load a van, because it takes time to add wheels to the lift, carry everything upstairs and make rails on the lift and in the van.
Another two hours of driving, just to test the train for ten miles.Testing with many cars, and with few. Forward, and backwards. It worked quite flawlessly.
The tugger derailed once when empty on a stick. In the past it would derail if it was looked at crosswise. Two scooter batteries under the frame helped, plus they power the headlights. Also the flat and gon ran well. I added a washer at one end and a lube ring on both ends made from milk jug plastic. I even pushed them around the track backwards without issue.
Then after a few hours it was time to pack up and head home again. A long two hour drive home.
Tuesday, July 15, 2014
Fixing
I let Robb use the train for a while. Jeff had brought it to Michigan after the IMLS spring meet, Robb installed two different radio control systems. The first one worked great for him at White Creek, the second a RCS system was not working that great when I took the train back when I was in Michigan The first week of July. After avoiding the machine for a while after a bad derail at ILS there was some work to do. Nancy is touching up the paint , I fixed the warped top and removed the pendant throttle with a cut wire that was causing unexpected full accelerations.
Some other things to do:
Make a new holder for control lever that is more firm
Make an emergency switch, a magnetic release or something
Make the second top.
Buy a new amp meter and rewire power source to be 5V from radio control
Make a crate to fit over the batteries.
Make some mudflaps from ice cream containers
Test the train this Saturday at IMLS
Make a crate that holds stuff and is attached to the flat car if Nancy wants a boat seat along
Pack for the trip to Coshoctan that starts in 23 days.
Put milk container washers on flat car trucks.

