Friday, August 22, 2014

Good train running

Our time at the convention went well.  The only derails appeared to be loading or track related not equipment based.  Over the three days that the loco was ran 53 miles were added to the odometer.

Lots of other steamers and such there also.  Some with short trains, some with long.
















Friday, August 08, 2014

Travel

To fit the five of us, our luggage, the gon, the tugger, the flat, and of course the Jeffrey Storage Battery Truck in the van takes some work.

The SBT goes into the gon, with support stuff stuffed around.

The flat is turned over and put on top.  These three are rolled into the van where the middle two seats go.  To protect the floor there is a plywood with 1x2 rails.  This is strapped down to the seat mounting pegs.  Hopefully we do not get into an accident, as that is a heavy load.

The kids get the third seat.  Yes it is a challenge having them all so close to each other and so far away from us.  Good thing I have a pretty convincing stare.  And I put the computer / DVD player on the railcars, sound over the stereo system and they can watch a movie.  Quite a treat for our normally DVD free van.

In the trunk area are two batteries, the battery cover and of course the tugger.  We skipped the suitcases and packed the clothes around the tugger in ebags packing cubes.  (advice to anyone that travels with family, buy one pattern of ebags cube for each person, it is easy to find each person's stuff.)  I do wish the batteries were either centered or farther forward in the van, but I do not have a good, safe, place for them.



 Oh I should mention that the best way I found to wedge the car to limit rolling is to place wedges between the wheels.  I did 3 of the 4 truck points.
In a few years, as the kids grow I can see us transitioning to the more traditional trailer for trains.  But for now, with the small van, and small kids, this works.

Sunday, August 03, 2014

Straps, ammeter, and mudflaps

To keep the big batteries attached to the top I screwed four velcro straps to the wood.  
 Then because the ammeter stopped working while the SBT was in Michigan I bought a new ammeter and installed it.  This on is only 0-30v the old one was 100V max.
 Then Nancy did not like some varnish drip marks on the top.  So she sanded it.
 Stained it.
 Stained it again.
 And again.
 She will start varnishing tonight after 8 hours of dry time.
While she was fixing the top I decided that I should install mud flaps.  This is good as steamers drop oil and water, if it gets kicked up and onto the control board I will be in trouble.  I suppose this will help if I run during or after a rain, or a sprinkler, hose, or spilled drink.

While the flaps are steal they are held in place with duck tape.  I will have to remember to bring more in case I need to do a field repair.

Saturday, August 02, 2014

New wood top

Yesterday I drilled all the holes in the steel strap.  48 holes for 4 screws per board.  I also countersunk all the holes with the drill press.   Then Nancy painted the two straps and 4 pins from 9pm until 10pm last night.

This morning they were dry.  I took my time to square up the two end boards, then I clamped and screwed them in.  after those two boards were well positioned I moved on to filling in the gap.  One trouble was getting the pilot hole in the wood centered in the steel hole.  If it is off center the screw moves the board.  I clamped some steel on the outside of each board to keep them all in line.  Then I found a roll pin.  This centered the drill bit, and had the added benefit of setting the depth of the drilling.  Worked quite well.
 Now the second top is complete.  All that is remaining this week is to make some mud flaps to protect the electronics from grime that the wheels may kick up.
Of course there are other things that need completion.  Wire up the headlight, install a new arduino based control system, touchup the paint, make the spiral spoke riding cars, and make a second larger engine.  But as of now we are ready for the Buckeye Limited.

Tuesday, July 29, 2014

Control stick #2

Today I drilled the hole to mount the new control stick mount.  This one is like the other one in that it it is held on by magnets.  The difference is this one has the magnets flat to the frame.  The holding power is better.  I have a 1/2"x1/4" N52 magnet coming from ebay that should be even stronger, as well as be the same size as the base.

 Those crates may look huge, truth is they are only 4ft high from deck to top.  
 They have some odd looking horses in these parts.... gauge is a little narrow, and the troller pole is up.  Better tell that engineer this is SBT territory.  


Sunday, July 27, 2014

battery cover

Saturday and a little today I made a cover of 12 crates to enshroud the batteries.  Each crate is 22"x34"x16".  Nancy and I think it looks good, we are wondering if we should paint them or label them.  Are they outbound finished product or inbound material?

Thursday, July 24, 2014

Pretty Battery tray

Today I started work on a better looking battery tray.  I mounted six 1x1 aluminum angles to the wood deck I fixed earlier.  Next I will make a wood box to cover the batteries.  Then I will decorate the wood box to look like a load as found in a factory.


Here are some factory pictures for inspiration.



Sunday, July 20, 2014

Lever bracket

The first direction lever bracket I made did not  hold onto the machine well enough.  I am making a new one, c shaped bracket.  A bunch of time with the dremel, benchgrinder, a file, and sand paper.  This went faster than I expected.  Next to drill the pivot hole.

Saturday, July 19, 2014

Successful Test Day

Almost six hours to load a van, because it takes time to add wheels to the lift, carry everything upstairs and make rails on the lift and in the van.

 Another two hours of driving, just to test the train for ten miles.


 Testing with many cars, and with few.  Forward, and backwards.  It worked quite flawlessly.

 The tugger derailed once when empty on a stick.  In the past it would derail if it was looked at crosswise.  Two scooter batteries under the frame helped, plus they power the headlights.  Also the flat and gon ran well.  I added a washer at one end and a lube ring on both ends made from milk jug plastic.  I even pushed them around the track backwards without issue.

Then after a few hours it was time to pack up and head home again.  A long two hour drive home.

Tuesday, July 15, 2014

Fixing

I let Robb use the train for a while.  Jeff had brought it to Michigan after the IMLS spring meet, Robb installed two different radio control systems.  The first one worked great for him at White Creek, the second a RCS system was not working that great when I took the train back when I was in Michigan The first week of July.  After avoiding the machine for a while after a bad derail at ILS there was some work to do.  Nancy is touching up the paint , I fixed the warped top and removed the pendant throttle with a cut wire that was causing unexpected full accelerations.

Some other things to do:
Make a new holder for control lever that is more firm
Make an emergency switch, a magnetic release or something
Make the second top.
Buy a new amp meter and rewire power source to be 5V from radio control
Make a crate to fit over the batteries.
Make some mudflaps from ice cream containers
Test the train this Saturday at IMLS
Make a crate that holds stuff and is attached to the flat car if Nancy wants a boat seat along
Pack for the trip to Coshoctan that starts in 23 days.
Put milk container washers on flat car trucks.