Sunday, September 08, 2013

Counterbore in order to tap less

This afternoon I added the counterbore to the pedistal spacer,  now after I get a new tap I will only have to tap 5 or 6 threads.  I also made a 1/4" thick spring rests that go on the inside of the journals.  I did not start the holes with a centerdrill because these parts will not be seen.  Note to self, centerdrills help, use them.  

I should also note how good of an idea it is to have all the equipment on casters.  Being able to easily move around the bandsaws, toolboxes, and arbor press / grinder is well worth the effort it took to make the bases.  The next thing I should do is run power to each of those machines.  As it stands I plug into an outlet by the dryer and run one extension cord to what ever tool I am using.  This is good for the drill press as I really like having it unplugged while I change tooling, for the other tools it is not as fun, especially if I am using several different tools in a row.

I am now going to make a jig that will be used to locate the springs and use the same spacing for the rivits that appear to hold the pedestals in place.

morning fix

Took an hour this morning to cut & layout the holes and drill 8 holes for the pedestal spacers.  Later I will do the counterbore and after I buy a tap, tap.

Saturday, September 07, 2013

two steps forward, one tap back

Made some nice progress today.  Cut all the parts related to the journals and pedestals.  I started drilling and tapping the 1/4-20 holes in the pedestal spacer bar shown on the front edge of the toolchest.


On hole #3 of 4 for the first side I broke off the tap when 3/4" in.  I knew I was skirting trouble by tapping so deep.  I bought 1" bolts, and the pedestals are 5/16" deep.  Robb suggested I drill the backside wider so I only have to tap 5 threads deep.  I will do that after I get a new tap & a new handle.   I thought I was being smart buying a 60 piece set from Menards for $25.  The handle stripped out within the first few turns of the first hole.  I was using a vice grip from then on.  My bad, I got distracted and torqued sideways.

I lifted the frame onto the batteries to get a better sense of how it will look when complete.  Also purchased the wood for the end steps, seen in front of the O scale train.  The end steps is 1/2"x3" for a scale 2x10.  The deck will be twelve 1x3" for scale 3x10s.

In other news I mounted the bench grinder today on the table behind the arbor press.  I wanted it far away from the O scale railroad, don't need metal dust on that track or in the engine.  Drilling a 1/4" hole through that 1" plate with a hand drill took a long time.  I took lots of breaks while doing it.

And for a parting shop here is a photo of a journal - pedestal assembly.  Brass buttons will keep the springs in place, need to have Jeff or Robb (or use of a lathe) to machine those.  Also the journals are 3 parts screwed together, none of the holes are drilled on those yet.

Friday, September 06, 2013

What to cut first

I received the last of the needed steel today.  Only metal left to is some brass that will be cut to holders for the springs.  I also need to purchase the wood deck material.   I got lots of choices in what to cut.  I cut the pedestal spacer, need to drill and tap the mounting holes for the pedestals. I also cut the brass glides for the journals.  And the center part of the journals, that is when I confirmed a fear I had last night, I did not account for clearance so the journal can slide up and down.  I will have to trim the pedestals so the brass is out a little so the journals can slide.  Note to self, update the drawing so there is clearance.


Monday, September 02, 2013

This weekend I made and used a template for rivit hole placement in the 8 corners.  Then used a 3/16" transfer punch to mark, a spring punch to deepen the hole, a center drill to start the hole and then a 3/16" drill to through hole 40 holes in the corners of the 1/2" thick bar stock. This is slightly less than half the holes needed for rivits.

The weekend was not without problems.  I was drilling the centerdrill too deep and eventually broke it off in the hole, both ends of the 1/16" - 1/4" style one.  I was told that I had my drill speed too slow.  I maxed it out to 3200 RPM and used a 1/8th" centerdrill to start rest of the holes.  Then at the advice of the manual & chat I keep the speed high to drill my 3/16" holes.  Burned up two drill bits on the first two holes.  Good news is I was able to clean out the holes no stuck drill bits.  Using my last drill bit I tried lowering the speed to 1500, 1000, 750, then 500 RPM.  The last two worked well, drilled the last 35 holes at 500 RPM. 

I also set the control board in place, I have to cut the ears of the motor mounts so it will all fit.  I am so worried about getting something bad into the motor and ruining it.  I guess I could have increased the length of the machine an inch or two to have more room.  It all fits in CAD, it should fit in real life.  Also at Nancy's urging I have started estimating how much of the steel stock I will keep.  The supplier is willing to reshelf any I do not use, charging me only for what I keep.  Their advantage is not cutting, mine is not paying to cut.  I am going to wait to do more until the pedistals they are cutting for me arrive, do some things like go for a bike ride.  I did turn the garden compost pile and play a game of tag with the kids in the front yard after dinner.

Saturday, August 31, 2013

Time to Start

The wheels finally came.  After measuring them I had to make some adjustments to the CAD drawing that took a week.  Thursday I sent a cut list of steel size to the steel vendor.  They were able to get about 1/2 of it next day, so Friday afternoon I picked up 8 12 foot long sticks of steel for the Jeffrey and riding cars.  5 more sizes are needed, plus some sheet steel.

The first cut.

I had to rearrange the basement so I had space for the sawhorse, a straight shot down the bottom of the stairs.  Robb suggested putting the saw onto a wheeled cart, I can tell you it was a great thing to do, but think about the weight of the machine when open, the rail on the cart is a counter balance.  
 This is what I had for trains this morning.  Nancy gave me the 16" tall mannequin for my birthday, he scales out to 5'4" tall.  Maybe someday he will have clothes.  Batteries are meant for a Schwinn scooter.  The Jeffrey letters are from Shapeways, 3D printed stainless steel.
Me setting up for cut number 2, tiny little adjustments so will not have much filing to do later.  The saw does cut at a 64th off square and the blade bows in over the course of the cut.  
 All four outer frame pieces cut and filed.

Saturday, August 17, 2013

Tools to make the Jeffrey

While waiting for the wheels to arrive Nancy and I have been reviewing craigslist for needed equipment.  So far we have added a Buffalo 4"x6" metal cutting bandsaw, a 3 ton arbor press, and a Enco 1/2hp drill press.





Wednesday, August 07, 2013

Waiting for Jeffrey

Nancy and I thought how nice it would be to have the parts for the Jeffrey and cars here by my birthday.  Did not happen.  I have added more details to the drawing, plus Robb started making wheels for two additional cars.  I will have the Jeffrey plus 4 more cars to pull.  A Generic Electric can pull 3 adults around a track all weekend without recharging so this thing should be able to pull the whole family.  Small scooter batteries will be under the deck and supplemental RV batteries will be the seats on the trailing cars.

Saturday, July 06, 2013

Jeffrey Update

I have the first pass of my drawings done, it was hoped that the drive wheels would be here by now, but alas I should have by mid August.  I also ordered the running gear for two trailing cars, they are also due in August.  I showed Nancy the estimated cost for the project, she stressed it better not cost more than that.

Saturday, May 25, 2013

I want a Jeffrey

In the July/August 2003 Narrow Gauge & Short Line Gazette Tim Stolle published a drawing of a Self Contained Battery Truck manufactured by the Jeffrey Company.  I said to myself, I want one of those someday.  Not in On30 as I usually model or Gn15 as Don Gage modeled below.

I wanted it in 1/4th scale ride on trains 7-1/2" gauge, like the car below.  I tucked the thought into the back of my head, and kept that issue on my nightstand for 10 years.  Many other magazines and books were read and shelved, projects made, moves completed, but that magazine was always nearby to look at and dream about.  Sometimes I would search the internet looking for more information but there was precious little on this machine other than the magazine or the model Don made.  That was until Google digitized the books and Harvard Library.  Included in that collection was Catalog #82 of the Jeffrey Manufacturing Company.  Not a treasure trove of information about this specific machine, I would have to write the company and ask for Bulletin #13A for that.  Well the company still existed, so I wrote them.  Tad, the grandson of the owner of the company 100 years ago wrote back to tell me that they did not have a copy of that information, nor blueprints of the machine.  

More internet searches, I found a library with a copy but wanted $25 per page to copy it, OK that is an option, but lets look more.  Library of Congress, did not have a copy nor did any of the Ohio historical societies.  But the Smithsonian did, it was on a whim that I had contacted them, and a kind librarian there emailed me not just the 16 pages of 13A but a total 83 pages of information about the Jeffrey Self Contained Storage Truck.  I may not have a blueprint but I had photos of all 4 sides and basic dimensions, I had descriptions of how the guts worked and information about trailing cars that could go with.  It was time to start drafting.
If I was going to make this ride on it needed to work, lots of internet searches saw people praising the Generic Electric by Plum Cove Studios.  While the body and frame was not right the motors, controller, and wheels would greatly simplify my work.   With my wife's blessing I ordered what I would need from them.  Now I have to wait for parts.