I am now going to make a jig that will be used to locate the springs and use the same spacing for the rivits that appear to hold the pedestals in place.
Sunday, September 08, 2013
Counterbore in order to tap less
I am now going to make a jig that will be used to locate the springs and use the same spacing for the rivits that appear to hold the pedestals in place.
morning fix
Took an hour this morning to cut & layout the holes and drill 8 holes for the pedestal spacers. Later I will do the counterbore and after I buy a tap, tap.
Saturday, September 07, 2013
two steps forward, one tap back
Made some nice progress today. Cut all the parts related to the journals and pedestals. I started drilling and tapping the 1/4-20 holes in the pedestal spacer bar shown on the front edge of the toolchest.
On hole #3 of 4 for the first side I broke off the tap when 3/4" in. I knew I was skirting trouble by tapping so deep. I bought 1" bolts, and the pedestals are 5/16" deep. Robb suggested I drill the backside wider so I only have to tap 5 threads deep. I will do that after I get a new tap & a new handle. I thought I was being smart buying a 60 piece set from Menards for $25. The handle stripped out within the first few turns of the first hole. I was using a vice grip from then on. My bad, I got distracted and torqued sideways.
I lifted the frame onto the batteries to get a better sense of how it will look when complete. Also purchased the wood for the end steps, seen in front of the O scale train. The end steps is 1/2"x3" for a scale 2x10. The deck will be twelve 1x3" for scale 3x10s.
In other news I mounted the bench grinder today on the table behind the arbor press. I wanted it far away from the O scale railroad, don't need metal dust on that track or in the engine. Drilling a 1/4" hole through that 1" plate with a hand drill took a long time. I took lots of breaks while doing it.
And for a parting shop here is a photo of a journal - pedestal assembly. Brass buttons will keep the springs in place, need to have Jeff or Robb (or use of a lathe) to machine those. Also the journals are 3 parts screwed together, none of the holes are drilled on those yet.
Friday, September 06, 2013
What to cut first
I received the last of the needed steel today. Only metal left to is some brass that will be cut to holders for the springs. I also need to purchase the wood deck material. I got lots of choices in what to cut. I cut the pedestal spacer, need to drill and tap the mounting holes for the pedestals. I also cut the brass glides for the journals. And the center part of the journals, that is when I confirmed a fear I had last night, I did not account for clearance so the journal can slide up and down. I will have to trim the pedestals so the brass is out a little so the journals can slide. Note to self, update the drawing so there is clearance.
Monday, September 02, 2013
Saturday, August 31, 2013
Time to Start
The wheels finally came. After measuring them I had to make some adjustments to the CAD drawing that took a week. Thursday I sent a cut list of steel size to the steel vendor. They were able to get about 1/2 of it next day, so Friday afternoon I picked up 8 12 foot long sticks of steel for the Jeffrey and riding cars. 5 more sizes are needed, plus some sheet steel.
The first cut.
Saturday, August 17, 2013
Tools to make the Jeffrey
While waiting for the wheels to arrive Nancy and I have been reviewing craigslist for needed equipment. So far we have added a Buffalo 4"x6" metal cutting bandsaw, a 3 ton arbor press, and a Enco 1/2hp drill press.



Wednesday, August 07, 2013
Waiting for Jeffrey
Nancy and I thought how nice it would be to have the parts for the Jeffrey and cars here by my birthday. Did not happen. I have added more details to the drawing, plus Robb started making wheels for two additional cars. I will have the Jeffrey plus 4 more cars to pull. A Generic Electric can pull 3 adults around a track all weekend without recharging so this thing should be able to pull the whole family. Small scooter batteries will be under the deck and supplemental RV batteries will be the seats on the trailing cars.
Saturday, July 06, 2013
Jeffrey Update
I have the first pass of my drawings done, it was hoped that the drive wheels would be here by now, but alas I should have by mid August. I also ordered the running gear for two trailing cars, they are also due in August. I showed Nancy the estimated cost for the project, she stressed it better not cost more than that.
Saturday, May 25, 2013
I want a Jeffrey
In the July/August 2003 Narrow Gauge & Short Line Gazette Tim Stolle published a drawing of a Self Contained Battery Truck manufactured by the Jeffrey Company. I said to myself, I want one of those someday. Not in On30 as I usually model or Gn15 as Don Gage modeled below.