Thursday, January 30, 2014

getting screws and drilling

Today I set the Storage Battery Truck upsidedown on the wood top.  Aligned everything square and figured out where the two top braces need to be located at.  Then Anna and I took the truck and drove to Menards to pick out #8 wood screws.

Back home I drilled one of the two top braces with 24 holes.  chamfering them also.  The other strap can wait until Saturday to be drilled.  I will also get the 4 step brackets this weekend also.

After this the last thing to make is the control stick.

Then paint and assembly.

No comments: